PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Sanitary piping at the Servery Room Facing North (600x800).jpg Installing duct work at the 1st Floor Facing East (800x600).jpg Installing the Sanitary piping at the 1st Floor Facing West (800x600).jpg Unloaded metal studs at the 4th Floor Facing East (800x600).jpg Welding clips along the columns at the 2nd Floor North Elevation (800x600).jpg
Previous page Welding clips along the columns at the 2nd Floor North Elevation (800x600)
Welding clips along the columns at the 2nd Floor North Elevation (800x600)